Client / FDC Construction and Fitout
Location / Darra, Queensland
Value / $20 million
Services / Integrated Architecture, Structural and Civil Engineering

 

The Blenners Transport Development encompasses 7,430m2 warehouse, amenities, receiving office, freezer/ chiller warehouse, ante room and forklift charge. The development also included a two level office, workshop, chilling equipment, truck wash and 115m2 of drivers amenities and relaxation area.

The contractor made clear the requirement to deliver a highly specified, high quality facility that would resolve the needs of the tenant through an efficient facility. Through the use of 3D modelling software and our integrated delivery model, McVeigh were able to take the client through the design elements in detail and provide them with certainty for their project.

McVeigh’s extensive experience in these kinds of projects continues deliver innovative ideas and results. By thoroughly investigating and understanding the end users operational requirements of the facility, McVeigh worked closely with the refrigeration consultant and contractor to resolve issues surrounding the slab and ground work requirements. The use of passive, underslab ventilation systems for the chiller/ freezer areas stopped the earth from freezing and expanding, which can cause cracks and defects in the finished product.

 

Through the use of McVeigh’s efficient steel design and documentation, the Client was able to speed up the steel work procurement to meet tight project deadlines. McVeigh utilised light-weight steel trusses to maximise spans over the chiller rooms which allowed for a flexible racking arrangement enabling an increased pallet storage floor area for the client.

About the Author